For a client in the Bakken oil field, we installed over 125 piles, in a swamp, to provide a solid deep foundation, allowing our client to build a terminal & pump station in a virtual marshland; the main pump building weighing close to 100 Tons.
For a client in the Bakken oil field, we installed over 200 piles of various size, from 3” to 6” piles in support of above ground piping and various pump buildings. Some piles were over 6’ above grade.
For a client in the Bakken oil field, we installed fifty-seven 4” square piles to depth of 30-40 ft. These piles were in support of eight 36’” joints of pipe, for a slug catcher. At the height required, some of these piles are 5’ above grade.